Seamless Startup of a Greenfield Ammonia-Urea Complex with Zero Critical Failures

  • Home
  • Portfolio
  • Seamless Startup of a Greenfield Ammonia-Urea Complex with Zero Critical Failures
Portfolio

Increasing Yield & Reducing Energy Losses in an Ammonia Production Plant

  • Fertilizer Production
  • Mid-sized manufacturer operating a 20-year-old ammonia plant
  • North Africa

Seamless Startup of a Greenfield Ammonia-Urea Complex with Zero Critical Failures

  • Fertilizers
  • State-backed fertilizer company
  • Greenfield ammonia-urea complex in North Africa

Obstacles Our Experts Have Transformed into Opportunities

A national fertilizer company was nearing mechanical completion of a new ammonia-urea complex but lacked a structured plan for commissioning and startup:

Unclear Handover Ownership

The handover process between EPC and operations was unclear, creating ownership gaps

Manual Commissioning Tracking

Commissioning sequences and punch list tracking were being done in Excel, with no version control

Operator Training Gap

Operators were unfamiliar with the plant’s systems, and no structured training program had been deployed

Missing Performance Tests

No performance guarantee test protocols were in place, risking contractual penalties

Uncoordinated System Energization

Critical equipment and systems were being energized with limited coordination between OEMs, contractors, and the client team

Startup Readiness at Risk

The risk of a failed or delayed startup loomed large—with operational readiness and safety on the line.

TEEC’s Expert-Led Solution

Our Experts activated its Commissioning, Startup & Operational Readiness service to orchestrate a structured transition from construction to operations:

What Our Experts Did

Developed a Ready-for-Startup (RFSU) framework, covering mechanical completion, commissioning, pre-startup safety reviews, and punch list closeout

Aligned commissioning plans with EPC and OEMs across all units (reformer, reactor, granulation, utilities)

Delivered a full training and competency program for operations and maintenance teams, including SOPs, emergency drills, and control room simulations

Designed and facilitated Performance Guarantee Test protocols in alignment with licensors and EPC warranties

Supported go-live with technical advisors embedded on-site through startup and stabilization

 TEEC ensured not just that systems were ready, but that people, procedures, and processes were ready too.

Execution Approach by Teec’s Experts

Startup Readiness Planning Commissioning Execution & Technical Support Operational Readiness & Workforce Enablement Performance Guarantee Testing & Handover
  • Developed a Ready-for-Startup (RFSU) Master Plan aligned with mechanical completion, commissioning, and handover milestones
  • Defined system-level commissioning packages and linked them to the project schedule and punch list closeout
  • Created digital checklists for subsystem readiness, including utilities, process units, and E&I systems
  • Embedded TEEC commissioning engineers in control rooms and field teams to oversee energization, flushing, and loop checks
  • Coordinated start-up sequencing across OEMs, EPC, and client teams to avoid overlaps and equipment stress
  • Resolved interface issues in real-time and managed commissioning logs, checklists, and sign-offs digitally
  • Delivered structured training programs including classroom, simulator, and field sessions
  • Developed SOPs, emergency response protocols, and critical procedures tailored to the new plant
  • Conducted Operator Competency Assessments and certification prior to handover
  • Designed and executed performance test procedures in coordination with licensors and off-takers
  • Monitored startup KPIs including ramp-up curve, emissions, yield, and energy consumption
  • Handed over a fully validated startup report and post-commissioning optimization plan

Results & Impact

0

Plant achieved first ammonia product within 9 days of gas-in, 2 weeks ahead of plan

0

Zero major incidents during commissioning across utilities and process units

0

Operator readiness improved dramatically, with 38 staff certified and deployed pre-startup

100%

All performance guarantees met on the first testing cycle, with no rework or commercial penalties

The Engineering consultants structured approach to commissioning and startup gave us the clarity and control we needed to ensure a smooth transition. Their deep technical expertise and focus on operational readiness helped us achieve a successful startup with zero critical failures.
Project Manager
State-backed Fertilizer Company

Integrated Value Through Teec’s Data-Driven Solutions

Data-Driven Solutions

Developed digital punch list and commissioning tracking tools, accessible by all stakeholders in real time
Linked startup SOPs to digital dashboards, showing readiness status by system and discipline
Used digital logs and alerts to escalate RFSU issues and streamline pre-commissioning verifications

BPM Solutions

Integrated startup SOPs into real-time monitoring tools to ensure system readiness
Enabled proactive issue resolution by tracking commissioning metrics across teams
Streamlined handover and post-commissioning optimization using digital logs and reports

With this integration, TEEC turned the startup from a high-risk black box into a transparent, trackable, team-driven success story.

Let Our Experts design a tailored performance strategy for your plant.