Extending Asset Life & Improving Equipment Reliability in an Aging Methanol Plant

  • Home
  • Portfolio
  • Extending Asset Life & Improving Equipment Reliability in an Aging Methanol Plant
Portfolio

Increasing Yield & Reducing Energy Losses in an Ammonia Production Plant

  • Fertilizer Production
  • Mid-sized manufacturer operating a 20-year-old ammonia plant
  • North Africa

Extending Asset Life & Improving Equipment Reliability in an Aging Methanol Plant

  • Methanol Production
  • 25-year-old methanol facility
  • Southeast Asia

Obstacles Our Experts Have Transformed into Opportunities

The client—operating an aging methanol facility—was struggling with asset reliability challenges

Unpredictable Failures

Critical equipment like heat exchangers, compressors, and columns were failing unexpectedly

Inconsistent Maintenance Records

Inspection logs were incomplete, and historical failure data was unreliable

Corrosion Issues

Increasing frequency of Corrosion Under Insulation (CUI) and other corrosion-related failures

No Mechanical Integrity Program

The plant lacked a structured approach for monitoring asset health or planning inspections

Aging Assets

Management acknowledged asset aging but lacked a strategy to mitigate its impact on performance and safety

Teec’s Expert-Led Solution: Process Performance Enhancement

Our Team of Experts implemented a comprehensive, data-driven program to improve asset integrity and extend equipment life

What Our Experts Did

Conducted a mechanical integrity audit across the plant, supported by non-destructive testing (NDT)

Applied Risk-Based Inspection (RBI) methodologies to prioritize inspections based on failure likelihood

Developed a corrosion risk map to target high-risk areas for proactive intervention

Built a reliability improvement plan focusing on rotating equipment and failure mode analysis

Created a centralized Asset Health Dashboard to integrate real-time data, maintenance logs, and inspection reports

Teec’s experts didn’t just assess the plant—they provided a strategic plan to safeguard long-term asset health.

Execution Approach by Teec’s Experts

Mechanical Integrity Audit & Field Diagnostics Risk-Based Inspection (RBI) Program Development Corrosion Mapping & Mitigation Planning Asset Reliability Roadmap & Handover
  • Conducted visual and ultrasonic inspections of high-risk static equipment
  • Analyzed historical failure data and chronic reliability issues
  • Performed vibration analysis and thermography on rotating equipment

  • Classified all assets using API 580/581 methodologies
  • Created custom inspection schedules, techniques, and coverage zones
  • Integrated inspection checklists into the Asset Health Dashboard for live updates
  • Created a corrosion circuit map to highlight vulnerable areas
  • Prioritized short-term (coating, insulation replacement) and long-term (material upgrades) mitigation strategies
  • Delivered a 3-year reliability plan aligned with budget cycles
  • Trained client teams to use the Asset Health Dashboard for decision-making
  • Integrated integrity KPIs into the plant’s monthly reporting cycle

Results & Impact

35%

35% reduction in critical equipment failures within 6 months

95%

95% inspection coverage of identified high-risk assets (up from 40%)

M

$1.2M saved in avoided maintenance and production losses

28%

 28% faster repair turnaround times through proactive interventions

The Experts approach wasn’t just technical—it was transformational. Their structured strategy has extended the life of our key assets and optimized our reliability.
Maintenance Director
Methanol Plant (Southeast Asia)

Integrated Value Through Teec’s Data-Driven Solutions

Data-Driven Solutions

Deployed real-time vibration and temperature monitoring tools, providing early failure detection
Automated priority flags for inspections based on continuously updated equipment health metrics
Visualized long-term asset performance trends linked directly to maintenance planning, extending MTBF (Mean Time Between Failures)

Data-Driven Solutions

Created a centralized Asset Health Dashboard for plant-wide visibility
Automated maintenance workflows and inspection scheduling
Fostered a culture of predictive maintenance through continuous data-driven decision-making

Teec’s Experts integration of predictive analytics transformed the client’s reactive maintenance culture into a proactive, forecasting-driven mindset.

Let Our Experts design a tailored performance strategy for your plant.