Increasing Yield & Reducing Energy Losses in an Ammonia Production Plant

  • Fertilizer Production
  • Mid-sized manufacturer operating a 20-year-old ammonia plant
  • North Africa

Embedding Compliance and Risk Controls in a New Petrochemical Plant Project

  • Chemicals and Intermediates
  • Multinational chemicals and intermediates producer
  • Greenfield olefins plant in the Mediterranean region

Obstacles Our Experts Have Transformed into Opportunities

 A multinational joint venture building a greenfield olefins plant in the Mediterranean region faced critical challenges related to regulatory compliance and risk oversight:

Conflicting Compliance Standards

Multiple regulatory regimes (local, EU, and investor standards) created confusion on compliance scope

Incomplete Safety Documentation

Safety documents (e.g. HAZOPs, QRA, SIL assessments) were either missing or incomplete at the end of FEED

Undefined Risk Ownership

Roles and responsibilities for risk ownership were unclear across EPC contractors

Manual Compliance Tracking

Compliance documentation was managed manually, with no standardized structure

Outdated Risk Register

The project risk register was outdated and not integrated into day-to-day project execution

Regulatory Delays & Penalties Risk

Without early alignment on safety and compliance, the project faced regulatory delays, liability exposure, and possible start-up penalties.

TEEC’s Expert-Led Solution

Our Experts launched their Safety, Risk & Regulatory Compliance service as a foundational control layer for the entire project:

What Our Experts Did

Defined a compliance framework mapping each regulatory obligation to responsible functions, from engineering to commissioning

Facilitated updated HAZOP, HAZID, and SIL workshops with cross-functional teams and external assessors

Built an integrated risk register, linked to project activities, design deliverables, and inspection readiness

Reviewed and advised on regulatory submission packages, ensuring completeness and alignment with permit authorities

Conducted training workshops for engineering and construction teams on regulatory and risk protocols

 The result: A project with risk visibility, audit readiness, and clear safety ownership from design through execution.

Execution Approach by Teec’s Experts

Compliance Landscape Mapping Safety Engineering & Risk Control Integration Documentation, Training & Audit Preparation Governance & Monitoring
  • Reviewed applicable regulations from national authorities, EU taxonomy, and corporate ESG standards
  • Mapped all safety and environmental permit conditions to project milestones and engineering deliverables
  • Created a unified Compliance Obligation Register (COR) with responsibilities assigned across EPC, client, and vendors
  • Facilitated comprehensive HAZOP, HAZID, and QRA workshops across all process units
  • Conducted SIL (Safety Integrity Level) classification using LOPA methodology and validated control logic
  • Reviewed design packages for alignment with safety studies and control of critical risks
  • Developed process safety procedures, ERP (Emergency Response Plans), and action plans for site-specific risk scenarios
  • Trained teams on compliance-critical topics, including permit-to-work (PTW), SIF testing, and safety reporting protocols
  • Created an Audit Readiness Toolkit, including dashboards for corrective action tracking and compliance metrics
  • Implemented a Regulatory Assurance Dashboard used during internal and third-party reviews
  • Monitored compliance closeout actions and safety KPIs weekly in project steering committee meetings
  • Supported client representation during permit and inspection engagements

Results & Impact

0

Achieved zero non-conformities in regulatory audits across three authorities

100%

Validated 100% of required SIL loops with full documentation and SIF testing prior to commissioning

78%

Reduced outstanding compliance action items by 78% within the first 3 months

42%

Emergency readiness drills improved team response times by 42%, validated during live simulations

Our Consultants approach ensured that we stayed ahead of regulatory requirements and compliance actions at every stage. Their expertise in risk control and safety integration streamlined the process, enabling us to stay on track without compromising on safety or quality.
Regulatory Affairs Manager
Multinational Chemicals Producer

Integrated Value Through Teec’s Data-Driven Solutions

Data-Driven Solutions

Developed digital templates and workflows for managing regulatory documentation, risk actions, and internal approvals
Linked risk register items to process safety and QA/QC milestones—ensuring traceability and accountability
Linked risk register items to process safety and QA/QC milestones—ensuring traceability and accountability

BPM Solutions

Integrated compliance tracking with real-time analytics, enhancing proactive decision-making
Streamlined documentation workflows to improve operational efficiency and reduce delays
Automated compliance action reminders and approvals, ensuring no critical deadlines were missed

This integration made compliance a systematic, cross-functional discipline, not a paperwork exercise.